Fire Fighting Design of Shanghai Metro Station

論文類型 技術與工程 發表日期 2001-05-01
作者 Gao,Naiyun,Peng,Haiq
關鍵詞 Subway station Fire Water Supply Subway fire fighting
摘要 The purpose of this article introduces characteristics of fire fighting design of Shanghai Metro Station, such as, the principles of fire fighting design, hydrant system, water screen system, sprinkler system, full automation and submerge chemicals system

出  自: CECS-TC24 and CCES-WWE-P United Annual Conference & Academic Exchange Between CP — IAPMO Technical Papers, May, 2001, Shanghai, p113-117.
發表時間: 2001-5

Gao Naiyun Peng Haiqing Fan Jinchu Deng yang
School of Environmental Science and Engineering,Tongji University,China
Add: 1239 Si Ping Rd.,Shanghai, Zip Code: 200092
Fax 021-65986786 Tel 021-65982691; 021-55057579

Abstract The purpose of this article introduces characteristics of fire fighting design of Shanghai Metro Station, such as, the principles of fire fighting design, hydrant system, water screen system, sprinkler system, full automation and submerge chemicals system, use of pipe material, meaning of leak current, measures of preventing it and otherwise in detail.

Keywords Subway station Fire Water Supply Subway fire fighting

A bid for design of Shanghai Metro Line One was invited in the summer of 1987. Then construction of Shanghai Metro reached a practical stage, including some works such as the feasible studies, etc. There are usually two floors in the subway station (the upper floor is the concourse and the blow one is the platform), which is as same as the stations of the other countries in the world. The station and the tunnel form a half - closed construction work. After the station put into operation, all kinds of electric equipment is serried and the passengers are crowded in the station. Once a fire disaster happens, the temperature in the tunnel will increase rapidly, the smoke becomes thicker and thicker, the passengers are too difficult to be evacuated, and fire fighters can‘t be easy to enter there for fire control. It will bring a great loss for the people‘s lives and property. Fire is the greatest disaster in the subway station according to the related reports. So fire-fighting design is viewed as a very vital work and fire control must be designed as an integrated system. There is no "Code for Subway Design " inland when Shanghai Metro Line One was in the stage of design. At that time, according to design experiences of subway stations in Beijing, Hongkong and foreign countries, it was decided that gas fire-extinguishing system was set in important equipment rooms of the station, such as the control center, the power distribution substation the communication equipment room and signals equipment room, etc. At the same time, it was decided that water screen system was set at the entrance of stair between the concourse and platform, hydrant system was in the other places, and sprinkler system was in concourse, which would be as a shop. But when designing stations in Shanghai Metro Line Two, the water screen system was canceled because of promulgation of new related codes and the others were same as Subway One‘s.

1Principles of Fire Fighting Design
· Fire fighting design of subway stations follows the principle — "Precaution must be the first, precaution and fire fighting must be integrated."
· Fire demand of water is decided according to one fire point at the same time along the subway.
· All water sources come from city water supply network and there are no reserved water source.
· Outlay of hydrants assures that, at the same time, two hydrants‘ water columns can reach wherever a fire happens.
· In the station, fire water pipes are detached from domestic water pipes and process water pipes so that fire water pipes are a independent and secure system.

2Fire Water Source

Fire water source directly comes from city water supply network without fire cisterns whether in Shanghai Metro Line One or Two. Fire pumping station is set up respectively in every subway station in order to reach fire pressure. Two-way service pipes should be considered in the design of subway station in principle; that is to say, two sources come from different city water supply pipes. But, in fact, there is only one water pipe can be as the source of fire water pumps near some subway stations. The pipe is usually a part of city ring pipeline. A valve is installed on the pipe and two service pipes come respectively from before and after the valve. Once there is something wrong with the source when a fire happens, close the valve and still guarantee one fire water source.

3Hydrant System

Basically, designs of the hydrant system are same between Shanghai Metro Line One and Two. Hydrant water supply is along all the line. The protected area of every station includes itself and a half line before and after itself. At the same time, a station is assured to supply fire water when there is something wrong with fire pumps of neighbor stations.Hydrant system fire flow is 20l /s. The flow of a squirt gun 5l /s. The shortest water column ≥ 10m . The space between fire hydrant boxes ≤ 50m in the concourse and ≤ 30m in the platform. The types of fire hydrant boxes in the Shanghai Metro Line Two are listed in table 1. Type Ⅲ fire hydrant boxes are mounted at entrances but not less than two entrances in every station. The hydrant boxes are used only as fire brigade inlets.

The Types of Fire Hydrant Chambers in the Subway Two table 1

Type Size (mm) Subassembly in the hydrant boxes place Ⅰ 1600x750x350 A hydrant of 65mm in diameter; a set of 19mm hose nozzle with a 25m-long hose; a set of hose reel of 25mm in diameter; a button for starting fire pump. Concourse of station; Where the length of a passage is longer than 25m. Ⅱ 1750x750x350 Two hydrants of 65mm in diameter; two sets of 19mm hose nozzle with a 25m-long hose; a set of hose reel of 25mm in diameter; a button for starting fire pump. platform Ⅲ 700x700x300 Two hydrants of 65mm in diameter without hose and hose nozzle Entrances of station

At the same time, the main pipes of hydrant system are arranged into ring pipeline. The ring pipeline in the concourse is along with the horizontal direction; the ring pipeline in the platform is along with the vertical direction. Pipes in the concourse are installed above false walls at both sides of it. Hydrant pipes in the platform of Shanghai Metro Line One are installed length ways below platform‘s boards; hydrant pipes in the platform of Shanghai Metro Line Two and The Second Phase Project of Rail Transit Pearl Line of Shanghai are fixed beside air tubes along with top boards. The diameter of the main pipe is 150mm in diameter and a valve is set at intervals of five hydrants.
Fire pumps are started or stopped by manual control in the pump station, started by button control in hydrant boxes (only started, but not stopped), are remotely controlled by station control room, and tele-monitored by fire center.
A fire main pipe is along every tunnel. Two parallel fire pipes in two tunnels between stations are connected with fire pipes in the stations by linking pipes in the station so that a ring pipeline takes place between stations and tunnels.
Two fire brigade inlets of 100mm in diameter put on above ground level (some on the wall) of the station. The municipal hydrants must exit between 15 - 40 meters away from the fire brigade inlet.
All the fire water supply pipes that go into or out of the station are considered to satisfy the demand of civil air defense.

4Water Screen System

Water screen system is only designed in Shanghai Metro Line One. It‘s at top of the stair and escalator between the concourse and the platform as a protection of separation. Once a fire happens, it separates the concourse and the platform, and prevents fire and smoke to enter into the concourse from the platform if the fire occurs in the platform and the reverse is also true.
Total water demand of water screen system is 60l /s.The water flow from nozzle of the most unfavorable point is ≥ 0.5l /s.m
The screen system adopts dry sprinkler system and type ZSY sprinkler valve, which made in China and by hand control or driving by alarm system. There is the room for sprinkler valve in every stair.
There are two water screen pumps and they are reserved each other. Water screen pumps draw water directly from city water supply pipes. Starting style of the pumps is by hand control through screen valve, is by hand control in the pump station, and remotely control from control room of the station or center room.
Water screen pipes form a ring at top of stair and escalator. A sprinkler head of the open system is made in China and installed at intervals of 1m along the three sides (the last side is closed because of the structure).
Four fire brigade inlets of 100mm in diameter are above ground level(some on the wall) with corresponding municipal hydrants.

5Fire Sprinkler System

The sprinkler system is placed in the underground market of concourse, which is built up at the same time with the subway. Sprinkler flow is 30l /s after calculation based on the formula of codes; the lowest pressure ≥ 50kPa; system operating time is 1 hour. There are two fire sprinkler pumps, one is in use, the other is reserved. The pumps draw water directly from city water supplies pipes. Sprinkler system consist of the control valve, ZSS wet alarm valve, the delay unit, the pressure switch, the water pressure alarm bell, the system test equipment, pressure meters, system drainage valves and pipes. Indication device of start/stop are in the control valve. Indicator of water flow are in the system. Automatic air valves are fixed on the top of main pipes. All of the sprinkler heads are closed, whose action temperature is 68 ℃ (red) . Sprinkler heads are fixed below air tubes and concrete installation places are corresponded with the figment in the station. Sprinkler systems are set in only some stations of Line One, but in all the stations of Line Two. In the design of The Second Phase Project of Rail Transit Pearl Line of Shanghai are fixed beside air tubes along with top, the place of the sprinkler pumps and related pipes are vacated in the majority of the stations. Sprinkler pumps can be controlled by alarm system or manual control inside the pump station, or can be remotely controlled by the control center.
Two fire brigade inlets of 100mm in diameter are placed on the ground of the station. The hydrants must exit between 15 and 40 meters away from the fire brigade inlets.

6Gas Fire Fighting System

1301 halogenated alkyl fire-extinguishing system is placed in Line One. After field survey and study, Inerge has been used in the design of Line Two. Inerge is in use in the design of The Second Phase Project of Rail Transit Pearl Line of Shanghai, too.
Full automation and submerge chemicals systems, consisting of automatic fire-extinguishing sprinkler equipment(the sprinkler system) and control-monitor equipment(control system), are set in the underground substation, center control room, the communication equipment room, the signal equipment room, the capacitor room, the high-low voltage distribution room, computer rooms and so on.
Because of absence of the code for full automation and submerge 1301 halogenated alkyl fire-extinguishing system in the course of design of Line One, the American related code (NFPA 12A -1980) was referred to. The complete set of American full automation and submerge 1301 fire-extinguishing system was expensively introduced into the subway.
Full automation and submerge chemicals system includes gas storage steel-containers, the container entrance valve, air jetting pipes and sprinkler heads. Control ways consist of automatic control, manual control and mechanical emergency control (semi-automation)
The place of fire extinguishers follows "Code for design and allocation of fire extinguishers in the building". Fire extinguishers are allocated based on "A" type of fire disaster in the middle-class danger.

7 Drainage of Wastewater from Fire Fighting

A wastewater cistern and a wastewater pump station are placed in every platform. The cistern volume and pump units are designed mostly according to drainage of fire water, besides seepage water from structure of the station. So the cistern volume and drainage capacity of pump units are above the total of fire water demand.

8 Prevention Electro-corrosion from Leakage of Current

One of duties in the subway station design is to prevent electro-corrosion from leakage of electricity in the subway station. What‘s leakage current? The subway train is driven by DC electric motor, which is supplied with 1500 v DC by a single trolley wire. The rails become back flow wires of drawing by electricity supply. As a result of electrical impedance in the rails, a voltage drop appears when drawing current enters the rails. A difference of electric pressure exists between the rails and the ground at the same time. So a leakage current appears between rails and underground structures and covered pipes. The current reaches near negative feedback point and enters rails again along underground structures and pipes. The leakage current is named as the leakage current. It can erode rails, their accessories, reinforcing steels of the underground structures and metal pipes. For prevention of erosion of fire water supply pipes and pump units, the fire water supply pipes link a 1-2meter-long insulator pipe (PVC-U pipe) which is 1.5m far away from the main structure body of station before fire water supply pipes enter into the concourse. The insulator pipes are in the place that is in dryness and easy for examination and repair. The pipes that cross the rail bed use plastic insulator pipes.
Rubber units of Insulate against vibration use as insulators for protection of pumps. A short insulator pipes are fixed in effluent pipe as an insulating way between pipe system and pump units.

9Pipe Materials

1) Fire water supply pipes(diameter ≤ DN100) adopt galvanizing steel pipes with screwed connection.
2) Fire water supply pipes(diameter > DN100) install seamless steel pipes with flange connection.

10Discussion and Suggestions

1) In design of Shanghai Metro Line One, water screen system is as a method of separation and protection at the top of stairs and escalators between the concourse and the platform. As experiments test, water screen can prevent the fire to spread and separate the concourse and the platform completely. At the same time, passengers search water for a feeling of security to be on fire psychologically so that they often hurried toward the entrance of stair with water. Obviously, the water screen system will help passengers to disperse and make passengers have the hopes of escaping with their life. So it‘s suggested that the water screen system should be set at the top of stairs and escalators between the concourse and the platform in the design of subway station.
2) There were no hose reels in the fire hydrant boxes in the design of Shanghai Metro Line One. It won‘t be disadvantage for the initial phase of fire fighting.
3) Sprinkler systems should be set not only in the concourse but also in the platform so that there is enough security for business development in the future in subway station. Though it‘s feasible that the room for prospective sprinkler pumps is left, it will be more difficult and more expensive to install these pipes in the future.

論文搜索

發表時間

月熱點論文

論文投稿

很多時候您的文章總是無緣變成鉛字。研究做到關鍵時,試驗有了起色時,是不是想和同行探討一下,工作中有了心得,您是不是很想與人分享,那么不要只是默默工作了,寫下來吧!投稿時,請以附件形式發至 paper@h2o-china.com ,請注明論文投稿。一旦采用,我們會為您增加100枚金幣。

成人福利视频在线观看_国产精品日韩久久久久_欧美全黄视频_欧美网色网址
久久99久久久欧美国产| 狠狠狠色丁香婷婷综合久久五月| 亚洲一区二区欧美激情| 精品在线观看免费| 色噜噜夜夜夜综合网| 精品人在线二区三区| 亚洲在线中文字幕| 成人免费三级在线| 欧美一级二级三级蜜桃| 一区二区三区自拍| 大美女一区二区三区| 日韩欧美在线不卡| 亚洲第一福利一区| av在线这里只有精品| 精品电影一区二区| 日韩成人免费电影| 欧美艳星brazzers| 中文字幕亚洲视频| 国产精品一二三四| 日韩免费看网站| 午夜视频在线观看一区二区三区| 99在线精品视频| 国产偷v国产偷v亚洲高清| 蜜臀av性久久久久蜜臀aⅴ四虎| 日本道精品一区二区三区| 中文字幕乱码亚洲精品一区| 精品在线亚洲视频| 91精品中文字幕一区二区三区| 亚洲另类中文字| 成人动漫一区二区在线| 久久久久久影视| 精品在线观看免费| 日韩精品一区二| 日韩一区精品字幕| 亚洲日本va午夜在线电影| 国产精品自在在线| 337p日本欧洲亚洲大胆精品| 日本欧洲一区二区| 7777精品伊人久久久大香线蕉超级流畅 | 欧美大片免费久久精品三p| 日韩国产在线一| 欧美精选一区二区| 亚洲电影在线免费观看| 欧美怡红院视频| 亚洲一区二区成人在线观看| 91福利区一区二区三区| 亚洲乱码国产乱码精品精可以看| 91香蕉视频mp4| 亚洲精品自拍动漫在线| 在线免费观看视频一区| 一区二区视频在线| 在线观看国产一区二区| 亚洲午夜电影在线| 欧美日韩国产系列| 青青草国产成人99久久| 日韩一级片在线播放| 久热成人在线视频| 久久久久青草大香线综合精品| 国产精品1区2区3区在线观看| 国产欧美日韩在线| 波多野结衣中文字幕一区 | 国产精品成人免费在线| hitomi一区二区三区精品| 日韩理论片中文av| 在线精品视频一区二区三四| 亚洲一区欧美一区| 91精品国产综合久久久久久| 久久精品国产一区二区| 久久蜜桃一区二区| 99久久国产综合精品麻豆| 一区二区三区四区精品在线视频| 欧美日韩欧美一区二区| 免费成人在线观看视频| 久久久噜噜噜久久中文字幕色伊伊| 岛国一区二区在线观看| 成人欧美一区二区三区| 欧美亚洲综合在线| 美国精品在线观看| 欧美国产乱子伦 | 最近日韩中文字幕| 欧美日韩情趣电影| 激情综合色播激情啊| 中文一区在线播放| 色成人在线视频| 日本亚洲免费观看| 中文字幕精品三区| 欧美在线free| 精品一区二区免费视频| 国产乱国产乱300精品| 国产精品进线69影院| 在线视频国内自拍亚洲视频| 日韩影院免费视频| 国产精品网站导航| 欧美无砖专区一中文字| 久久99久久99精品免视看婷婷 | 亚洲高清免费在线| 久久在线观看免费| 91浏览器打开| 麻豆精品在线播放| 综合久久一区二区三区| 91精品婷婷国产综合久久| 高清成人在线观看| 天天做天天摸天天爽国产一区| 337p日本欧洲亚洲大胆精品| 91老司机福利 在线| 韩国理伦片一区二区三区在线播放| 椎名由奈av一区二区三区| 欧美高清视频一二三区| 成人爽a毛片一区二区免费| 亚洲成人免费在线| 欧美国产在线观看| 欧美日韩成人激情| 成人激情小说乱人伦| 奇米影视一区二区三区小说| 国产精品黄色在线观看| 日韩欧美精品在线| 91成人免费网站| 国产成人无遮挡在线视频| 午夜精品免费在线| 中文字幕中文乱码欧美一区二区 | 日韩和欧美一区二区三区| 国产精品区一区二区三区| 538在线一区二区精品国产| a在线欧美一区| 久久不见久久见中文字幕免费| 亚洲欧洲日韩综合一区二区| 日韩精品一区二区三区老鸭窝| 色综合久久综合网97色综合| 国产一区不卡精品| 天堂久久久久va久久久久| 中文字幕综合网| 国产欧美视频一区二区三区| 欧美一区二区三区小说| 色av一区二区| 成人国产电影网| 国模一区二区三区白浆| 日日骚欧美日韩| 亚洲激情图片一区| 中文子幕无线码一区tr| 欧美精品一区二区三区蜜桃视频| 欧美亚洲综合色| 91小宝寻花一区二区三区| 国产很黄免费观看久久| 日韩主播视频在线| 一区av在线播放| 亚洲天堂a在线| 国产精品美女久久久久av爽李琼| 亚洲精品一区在线观看| 91麻豆精品91久久久久同性| 在线精品视频一区二区| 国产精品久久久久久久久图文区 | 成人高清伦理免费影院在线观看| 久久精品噜噜噜成人av农村| 亚洲国产欧美日韩另类综合 | 视频在线在亚洲| 一区二区三区在线播放| 中文字幕日本不卡| 国产女人aaa级久久久级| 精品福利一二区| 日韩一卡二卡三卡四卡| 91麻豆精品久久久久蜜臀| 欧美性受xxxx黑人xyx| 色欧美88888久久久久久影院| 丰满放荡岳乱妇91ww| 国产精品18久久久久久久网站| 九九国产精品视频| 九九精品视频在线看| 麻豆成人久久精品二区三区红| 日韩精品亚洲专区| 人人狠狠综合久久亚洲| 午夜av一区二区| 午夜欧美电影在线观看| 亚洲电影欧美电影有声小说| 亚洲午夜久久久久久久久久久 | 欧美性猛交xxxx黑人交| 91久久线看在观草草青青| 色八戒一区二区三区| 91久久精品一区二区二区| 色菇凉天天综合网| 欧美曰成人黄网| 欧美人与z0zoxxxx视频| 制服丝袜国产精品| 日韩三区在线观看| 欧美xxxxxxxxx| 久久五月婷婷丁香社区| 国产日韩精品视频一区| 欧美激情综合在线| 中文字幕中文字幕中文字幕亚洲无线| 国产精品久久久久久久久快鸭 | 99久久精品国产毛片| 91在线视频播放| 91久久国产综合久久| 欧美午夜电影一区| 欧美一区二区三区四区高清| 日韩精品专区在线影院观看 | 国产精品一区一区三区| 成人综合激情网| 色又黄又爽网站www久久| 欧美偷拍一区二区| 日韩小视频在线观看专区|